
Unofficial Networks has obtainedĀ this official email from Valle de Las LeƱas.Ā
On a historical occasion, Valle de Las LeƱas is pleased to inform you about the purchase of a new cutting-edge ski lift, featuring state-of-the art technology, provided by Austrian company Doppelmayr, world leader in quality, safety and technology in ski lifts.
The new ski lift is aĀ quadĀ chairlift, featuring a modern system for entering the lift which allows comfortable access and reduces waiting time. Prior to ascent, the skier slides over aĀ moving mat, which propels her/him up to the right speed so that s/he can sit on the chair in a smooth andĀ effortlessĀ manner.
The new ski lift will be installed in the Minerva area, the busiest area on the mountain, and, together with existing ski liftsĀ (TS Caris and TK Minerva), will allow a total ofĀ 4,230 people per hourĀ to access the area, thus tripling current capacity.
Technical information:
- 1,190 m in length
- 296.50 m in vertical elevation
- 7.91 min. to ascend
- 2,100 passengers per hour
- 4 passengers per vehicle
The purchase of this new ski lift belongs to the first stage of mountain redesign, which will enable us to decentralize activities towards other skiable areas of the resort.
The project is part of an expansion and investment policy introduced in the past years in all areas of the Valle, which, through technology, gives rise toĀ the safest and most modern mountain in South America.
Therefore, year after year, Valle de Las Leñas continues providing all its visitors with an excellent service, always being the place where you dream of skiing.
Warm regards,
Valle de Las LeƱas
Ā Our inside source has also informed us that the much talked aboutĀ Paraiso Project is on track for 2013. If this project is in fact in the works it will be an absolute game changer for not only Las LeƱas but South America skiing as a whole.Ā

